Planning for Vector Generation 3 begins, over 10,000 individuals. The equipment to create them would be decommissioned after their release. Birds, reptiles, aquatics are part of Gen III, ironically called “Project Sink or Swim.”
Planning for Vector Generation 3 begins, over 10,000 individuals. The equipment to create them would be decommissioned after their release. Birds, reptiles, aquatics are part of Gen III, ironically called “Project Sink or Swim.”